Project Deliverables (Please include a section in the document for each of the below)

The project requires students to perform three phases: (a) requirements analysis, (b) system and database design, and (c) a project plan. Note that in the phase 3, students are required to use the MS Project software for their project schedule.

The deadline for the Individual Project can be found in the schedule section of the class syllabus.

The following layout format covering a title page and all three phases is recommended for the project.

Title page (project name, author, and date)

Phase 1: Requirement analysis

  1. Problem definition
  2. Issues
  3. Objectives
  4. Requirements
  5. Constraints
  6. Description of the proposed system
  7. Logical model design

Data flow diagrams

Context diagram

Diagram 0

Descriptions of processes in each diagram

Descriptions of outputs/inputs/performance/security or controls

  1. Specific requirements, if any (interface, operational, resource, performance, etc.)

Phase 2: System and database design

  1. User interface

Design an overall user interface consisting of screens, commands, controls, and features to enable users to use the system.

How data will be input to the system?

The physical layout for each input

The input design and procedures

How data will be output from the system?

The physical layout for each output

The output design and procedures

  1. Data design

Develop a plan for data organization, storage, updating, and retrieval.

Database design

Database tables with their attributes should be presented

Primary key(s) should be identified in each table, if any

Three steps of normalization should be included.

Entity-relationship diagrams

Data file storage and access

  1. System architecture

Determine the architecture of the system as Web-based interface, client/server architecture, Internet/Intranet interface, network configuration, etc.

Phase 3: Project plan

A list of tasks or activities needed for implementing the proposed system

Estimating completion time and costs

A project schedule for performing those activities (Gantt charts or PERT charts)

Note that there is no other required software package except the MS Project software in this ITEC-630 course. As a result, you are only required to use the MS Project software to handle the scheduling part of the project and for other parts, you can use any word editing software or any drawing tools software.

 

 
Leave a comment

Posted by on March 29, 2017 in academic writing, Academic Writing

 

Tags:

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

 
%d bloggers like this: