Potfolio of Measurement and Cost Model Project

22 Nov

≪Potfolio of Measurement and Cost Model Project≫
≪MTCC4021≫
≪MTCC4021≫ Page 1 of 7
≪Potfolio of Measurement and Cost Model Project ≫
≪MTCC4021 ≫
ARTEFACT ≪ 1 OF 1 ≫
CONTRIBUTION TO FINAL
MARKS
50%
DUE DATE* 29th December 2016
STUDENT DETAILS (TO BE FILLED BY THE STUDENT)
MTC STUDENT NUMBER DATE OF SUBMISSION**
DEPARTMENT GROUP
INSTRUCTIONS:
1. *Submit your report via the Turnitin link on Moodle before the due date mentioned above.
2. **The date you upload to Moodle is considered as the ‘Date of Submission’ when calculating
the late submission.
3. Any late submission will result in late submission cap being applied.
4. For further information, related to MTC assessments and examinations, please refer to the
regulations sections in MTC examinations website.
5. Please mark your assignment to the attention of: Eng. Brian Lawlor
6. Submissions must be presented in an A4 papers.
7. Writing format needs to be in 12 font size and 1.5 line spacing.
The Military Technological College regulations require students to keep electronic copies
of all assignments, and submit these at any time upon request.
≪Potfolio of Measurement and Cost Model Project≫
≪MTCC4021≫
≪MTCC4021≫ Page 2 of 7
Objectives:
 The objectives of this report are to:
o Take off dimensions from industry standard drawings and input correctly onto standard
dimension paper.
o Create a cost estimate for a proposed building
o Create a Cost Plan for a proposed building
o Use BIM software to extract quantities to produce a cost estimate
Background:
Measurement and cost planning are essential skills for construction personnel at the design stage. Cost
planning ensures that costs are accurately built up and updated as the design of a project develops from
inception to construction. Measurement and cost planning are indeed different in discipline but they
both require skill acquired, not only in school but through experience and commercial knowledge. RICS
have introduced a specific document to ensure industry standard consistency in the production and
measurement of estimates/cost plans, NRM1 (New Rules of Measurement). NRM1 outlines the rules
associated with creating estimates/cost plans as well as highlighting the information required to produce
the cost estimates. This consistent approach will allow for more accurate estimates into the future. The
development of IT, namely BIM (Building Information Modelling) will also assist in all aspects of the
construction projects and will become an integral item in the industry workflows.
Task:
From the industry drawings provided you are required to prepare
 An estimate for the basement of the attached building
 A cost plan for the Superstructure of the building
 A cost plan – based upon level 2 codes for the building; based upon the results of the cost plan
for the superstructure and other given values
 A cost estimate for a building with quantities extracted from a BIM model
Procedure:
The report needs to be structured to cover the following points:
 Create drawing register
 Take off required quantities as per NRM1 code and description.
o Query sheet to be kept and maintained during the take-off process
 Required estimates and cost plans to be produced with the required detail
 Carry out the BIM exercise in the computer Lab and compute the quantities
≪Potfolio of Measurement and Cost Model Project≫
≪MTCC4021≫
≪MTCC4021≫ Page 3 of 7
Learning outcomes:
On successful completion of this assignment, students will be expected, at threshold level, to be able to:
o Define and select cost planning and modelling techniques for building projects [LO
1]
o Describe the sequence of taking off quantities in accordance with RICS standard
documentation. [LO4]
o Outline the rules of the relevant method of measurement ensuring
comprehensive bill descriptions [LO5]
o Prepare basic measurements for a range of building elements [LO6]
o Use IT tools in the formulation of cost models and quantification [LO7]
Reading / References:
 Class Notes on the moodle
 RICS, 2012. NRM 1 – Order of Cost Estimating and Cost Planning for Capital
Building Works: NRM 1 (New Rules of Measurement). 2nd Revised edition
Edition. RICS Books
 Sean D. C. Ostrowski, 2013. Estimating and Cost Planning Using the New Rules of
Measurement. 1 Edition. Wiley-Blackwell.

Notes:
 The assignment is worth 50% of the total module mark.
 Further guidance will be given during taught sessions.
 Tender queries to be forwarded to the following email address brian.lawlor@mtc.edu.om ;
Please include MTCC4021 Project in the subject area
 Memos with further guidance/clarifications will be given ,via email, through the cost planning
period
COVERING INFORMATION (TO BE FILLED BY THE STUDENT AND ATTACH TO THE ASSIGNMENT)
My title/cover page clearly shows:
 My student number
≪Potfolio of Measurement and Cost Model Project≫
≪MTCC4021≫
≪MTCC4021≫ Page 4 of 7
 Assignment title
 Unit title
Results and Discussion
 I present the test results clearly and with the support ……………………………………….
 I discuss the relationship ………………………………………………………………..
 I consider the …………………………………………………………………………………
 I have provided a conclusion ……………………………………………………………..
Other sections of the report
 I state the aim of the work
 I briefly describe the test procedures involved in analysing …………………………..
 I show a worked example of the calculations ……………………………
………………………………………………………………………………………
 I clear identify …………………………………………………………………………..
 I link the conclusion back to the aim of the work
Overall presentation
 The structure of my report conforms to ……………………………………… report
 Where I use a reference I list it using the Harvard format
 My report is clear and concise
 I specify S.I. units for all values quoted
 My tables and graphs are correctly numbered and labelled
 I write in impersonal, past tense
 I make correct use of grammar, spelling and punctuation
≪Potfolio of Measurement and Cost Model Project≫
≪MTCC4021≫
≪MTCC4021≫ Page 5 of 7
GRADE CRITERIA
Please refer to the grade descriptors given in the Student Handbook. The following table shows specific
features of work at each grade for this particular coursework and level of study.
Grade (%)
Specific Features
80+
Results presented appropriately and discussion shows evidence of thorough
understanding of the subject matter, showing some originality or creativity.
Other sections of the report are clear and logical, making very good use of references
beyond the material given.
Report is well-presented, written in impersonal, past tense with no errors.
70-79
Results presented appropriately and discussion shows evidence of thorough
understanding of the subject matter.
Other sections of the report are clear and logical, making good use of references
beyond the material given.
Report is well-presented, written in impersonal, past tense with few or no errors.
60-69
Results presented appropriately and discussion shows evidence of understanding of
the subject matter.
Other sections of the report are clear. Appropriate references used.
Report is well-presented and correctly structured, with few errors in use of units,
citation of references and format of graphs and tables.
50-59
Results suitably presented and described. Discussion shows evidence of
consideration of the significance of the results.
Adequate description of procedures and aims. Some references given beyond
provided material.
Report is generally consistent in presentation and follows instructions given with
some errors.
40-49
Results suitably presented and described.
Adequate description of procedures and aims. Some references given but relies on
material provided.
Referencing and presentation attempt to follow instructions given.
30-39
Incomplete results, little or no discussion.
Inadequate description of experiment and aims. No or very few references given.
Poor, inconsistent presentation. Incorrect structure.
0-29
No serious attempt to address the problem.
Evidence of group working or plagiarism.
≪Potfolio of Measurement and Cost Model Project≫
≪MTCC4021≫
≪MTCC4021≫ Page 6 of 7
ARTEFACT ≪ 1 OF 1 ≫
Student Number: CONTRIBUTION TO FINAL MARKS
Assessor / Second Marker
(% Mark)
Assessment criteria
Maximum
Mark
Mark
Awarded
Comments
Report
(report presentation, clarity,
aim, graphs, Terminology,
etc.)
5 Intro/Aim/Purpose (X):
Estimate of Basement 25 GIFA (2)
Identification of measurement items complete with NRM1
coding (3)
Measurement & Query Sheet (15)
Accuracy (5)
Cost plan for the group
element superstructure
35
GIFA (2)
Identification of measurement items (5)
Measurement & Query Sheet(20)
Accuracy (5)
Quantifications/Assumptions (3)
Cost Plan to Level 2 codes 15 Layout, Accuracy (5)
Produce in accordance with Template in Appendix H (5)
Summarise the costs for the Project using Excel (5)
Estimate from the BIM 15 Extraction of Quantities (7)
Sourced Information (3)
Summarise the costs for the Project using Excel (5)
Conclusions
Logic and accuracy of conclusion,
relevant to assignment brief)
5
Logic of Conclusion (X):
≪Potfolio of Measurement and Cost Model Project≫
≪MTCC4021≫
≪MTCC4021≫ Page 7 of 7
Additional comments
Further comments can be made overleaf
Signature: ……………………………… Date: ………………………………

 
Leave a comment

Posted by on November 22, 2016 in academic writing, Uncategorized

 

Tags: , ,

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

 
%d bloggers like this: